sb.scorecardresearch

Published 21:18 IST, September 24th 2024

Coming Soon: Mumbai's First Underground Metro To Cut Travel Time Between Aarey and BKC

The first phase of Mumbai's first underground Metro or aqua line between Aarey Colony and Bandra-Kurla Complex will be operational shortly.

Reported by: Digital Desk
Follow: Google News Icon
  • share
Mumbai's First Underground Metro To Cut Travel Time Between Aarey and BKC
Mumbai's First Underground Metro To Cut Travel Time Between Aarey and BKC | Image: representative

Mumbai: The first segment of Mumbai underground Metro, also known as the Aqua Line, is set to be operational shortly, after the necessary safety approvals. 

This phase will connect Aarey Colony and Bandra-Kurla Complex, a senior official told PTI on Tuesday.

Mumbai underground Metro

The 12.5 km stretch between Aarey Colony and BKC is part of the 33.5 km Colaba-Seepz-Aarey Metro Line 3.

Addressing a press conference, Ashwini Bhide, managing director for Mumbai Metro Rail Corporation (MMRC), said the Metro Line 3 is poised to be commissioned very soon, subject to clearance by the Commissioner of Metro Railway Safety (CMRS).

She said of the two necessary approvals, they have already received the nod for rolling stocks (Metro train), while the application for the rail line is pending approval.

Mumbai Metro Aqua Line

According to official sources, out of the 33.5 km long underground Metro corridor between Colaba-Seepz-Aarey, the 12.5 km Aarey Colony to Bandra-Kurla Complex route is likely to be inaugurated with the hands of Prime Minister Narendra Modi with other infra projects in the state in the first week of October.

Bhide said almost 93 per cent of the work on the corridor is complete, and the entire line between Colaba and Aarey is likely to be commissioned by March or May 2025.

Mumbai Metro Timings

The Aarey-BKC stretch has ten stations, providing connectivity to both Terminal 1 and 2 of the Chhatrapati Shivaji Maharaj International Airport and the Ghatkopar-Andheri-Versova Metro Line 1 at Marol Naka station.

Bhide said they have planned 96 daily services between Aarey and BKC, with eight trains in their fleet from 6.30 am to 10.30 pm, except on Sunday when the first service will be at 8.30 am.

Mumbai Metro fare

She said the minimum fare on the line will be Rs 10, the maximum will be Rs 50, and the maximum fare will be Rs 70 when the entire Colaba-SEEPZ-Aarey corridor is commissioned.

Mumbai Metro Capacity

The designed speed of eight coach Metro trains on the line is 85 kmph, while the average running speed will be 35 kmph.

The first phase of the corridor has a carrying capacity of 6.5 lakh passengers per day.

Bhide said there will be 48 captains, including ten women, for the train operation. There will be many women in the operation and maintenance of the line once it is commissioned. 

With PTI Inputs

Updated 21:18 IST, September 24th 2024